12.1 C
New Delhi
Friday, December 13, 2024
HomeFinanceNew Pink Line Metro Corridor built in Delhi, these 8 stations will...

New Pink Line Metro Corridor built in Delhi, these 8 stations will be included: Delhi Metro

The Maujpur-Majlis Park Metro Corridor under development for the expansion of Pink Line in Delhi Metro Phase IV will be unique in numerous ways.

On this passage, the two layer hallway between Bhajanpura to Yamuna Vihar, the fifth scaffold of the metro on Yamuna and the consolidated design of flyover and metro line lined up with one another close to Surghat will draw in individuals.


Crafted by a few support points for the two layer passage of this metro line has been finished. Because of this the two layer passageway has begun coming to fruition. In any case, because of deferral in work because of Corona, the 12.58 km long Maujpur-Majlis Park passageway will be prepared in the following one and a half years.

This passage is an expansion venture of the current 58.43 km long Pink Line (Majlis Park-Shiv Vihar). Its development work began in the year 2020. The Public Works Department (PWD) will have a flyover at a level of 9.5 meters over the ground pronto decker passage and the metro hall will be nine meters over the flyover.

Along these lines, the absolute level of the metro passage starting from the earliest stage be 18.5 meters. The length of the fifth extension being based on Yamuna for this passage will be 560 meters.

Component of the extension
Length of the extension – 560 meters Number of support points – Nine will be the quantity of ranges utilized in the development of the scaffold – Nine Length of one range – 60 meters and 80 meters
There will be eight stations

Eight metro stations will be based on this passageway. In which there will be Burari, Jharoda Majra, Jagatpur, Surghat, Sonia Vihar, Khajuri Khas, Bhajanpura and Yamuna Vihar .

Source

- Advertisment -

YOU MAY ALSO LIKE..

Our Archieves